Florenville · Semois valley · Belgian Ardennes
The Sainte-Cécile Himalayan suspension bridge
185 metres long, suspended high above the Semois in Florenville. Free, on foot, open since 20 June 2026, except in bad weather and on hunting days.
Coming soon · November 2026
What if the bridge was only the beginning?
An adventure to enjoy on your smartphone around the bridge: a map, a compass, stages that open on the spot, observation missions and legends.
- No app to install
- Once for the whole group
- The bridge stays free
Before you go
Everything you need to know, in two minutes
The questions everyone asks. Short answers, checked against official sources or on site.
Announced closure days
Bridge and car park closed all day on hunting days, from October 2026 to January 2027, and on 14 October 2026 from 6 am to 11 pm for works nearby.Verified· S16 S17
Next closures
- Hunting day
- Hunting day
- Hunting day
- Works, from 6 am to 11 pm
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
- Hunting day
Before you go, check
Where to park?
At the designated car park on Route d’Herbeumont in Sainte-Cécile. Parking is free.
Verified· S4 S7Checked on site· 11.10.2026Directions in Google Maps →
How far is it from the car park?
About a 20-minute walk along forest paths. You cannot drive to the bridge.
Checked on site· 11.10.2026
Is it scary?
It sways a little and the deck is see-through: you can see the Semois beneath your feet. A sign asks you not to make it sway. Some people turn back, and that is fine.
Press· S19Checked on site· 11.10.2026
Without a car?
By train to Florenville. The bus to Sainte-Cécile runs only once or twice a day: check the TEC timetable.
Checked on site· 11.10.2026To be confirmed· S14Train, bus, on foot: from the station to the bridge →
Starting point: designated car park, Route d’Herbeumont, 6820 Sainte-Cécile, Belgium
On site
What it really looks like
A few photos taken on the bridge, so you know what to expect.




The guide’s tip
The first time, cross downhill.
The bridge is higher on the Sainte-Cécile side than on the Épioux side. It’s high and it moves a little: for your first crossing, start from Sainte-Cécile and head down towards Les Épioux. It’s easier.
Once you’ve got the hang of it, feel free to come back the other way.
— Mathieu Galerin, guide and founder of Guide Rando Trail Checked on site· 11.10.2026
Fact file
The bridge in a few facts
A modern rope bridge, also known as the Florenville Himalayan bridge or the Semois suspension bridge, open to the public since 20 June 2026 in the heart of the Semois Valley National Park.
Make a walk of it
Two waymarked loops
From the car park on Route d’Herbeumont: follow the coloured rectangle. The bridge also links the GR 16 and GR 129 long-distance trails.
- Short loop
6 km
Waymarking: green rectangle
Start: car park on Route d’HerbeumontDirections in Google Maps →
Verified· S4 S7 - Long loop
9 km
Waymarking: yellow rectangle
Start: car park on Route d’HerbeumontDirections in Google Maps →
Verified· S4 S7
Explore freely, discover differently, or let a guide show you
Three ways to experience it
The bridge is free, and it will stay that way. You can also discover it differently.
On your own
Free
Cross at your own pace, then carry on along one of the two waymarked loops of 6 or 9 km.
Plan my visitAs an adventure
November 2026 · €9.90 for waiting-list members
November 2026 · €14.90 per group
Self-guided adventures are coming soon: riddles, observation missions and discoveries on your smartphone, at your own pace.
Offered by Mathieu Galerin
Discover the adventureWith a guide
On request
A guided outing in the Semois valley with Guide Rando Trail: hiking, trail running or packrafting.
Offered by Mathieu Galerin
Go with a guide
The adventures and guided outings are a private initiative, with no official link to the town of Florenville or the National Park.
Coming soon: discover differently
Secrets of the Bridge
Self-guided adventures are coming soon. The first one, to enjoy on your smartphone with family or friends, is planned for November 2026. Meanwhile, watch the film: the adventure in 43 seconds.
- 01The stage unlocks as you walkOr tap to unlock it by hand: you never need GPS or a signal.
- 02A mission on siteLook, search, answer: the bridge becomes a playground.
- 03The revealWhat you need to know, with verified, sourced facts.
185 metres of Himalayan bridge, nearly 30 m above the Semois. The adventure starts from a link, with no app: a map follows your position, a compass guides you to each stage, stages open on the spot, with observation missions and discoveries. Available in November 2026; launch price of €9.90 VAT incl. per group for waiting-list members, valid until 31 December 2026, then €14.90 VAT incl. per group from 01 January 2027.
Or let a guide show you
With a guide who knows every trail
Since 2016, Guide Rando Trail has been running non-competitive guided outings in the Semois valley: hiking, trail running and packrafting. For families, groups of friends or companies.
- Private guide from 2 people, on the region’s finest trails
- Packraft hike: on foot on the way out, on the river on the way back
- Tailor-made for groups, private outings on request

What are the opening hours?
Does the bridge move?
A little, yes: that is how a Himalayan suspension bridge works, hanging from its cables. If you are afraid of heights, make your first crossing going downhill, from Sainte-Cécile towards Les Épioux.
Checked on site· 11.10.2026
Is the bridge closed during the hunting season?
Yes. A municipal order from the Town of Florenville closes the bridge and its car park all day on hunting days: 9, 10, 11, 15, 16 and 17 October, 5, 6, 7, 8, 19, 20 and 21 November, 3, 12, 13, 17, 18 and 19 December 2026, and 7 and 21 January 2027. This calendar may change. Before any walk, also check ChasseOnWeb, the Walloon public service portal for hunting in the forests.
How do I know if the bridge is open today?
Is it scary if I am afraid of heights?
A little, yes: the bridge sways under your steps and you can see the Semois through the grating. A sign warns that the crossing is dizzying and asks you not to make the bridge sway. The first time, cross going downhill, from Sainte-Cécile towards Les Épioux.
Press· S19Checked on site· 11.10.2026
Who created this website?
A local, independent, verified guide
This website is written by Mathieu Galerin, guide and founder of Guide Rando Trail. It is not the official website of the bridge, the Town of Florenville, the Semois Valley National Park or a tourist office.
Every fact comes from an official source, listed at the bottom of the page, or from an on-site check. Anything that could not be verified is not shown, or is labelled “to be confirmed”.
In brief
- The Sainte-Cécile Himalayan bridge spans the Semois in Florenville, Belgium: 185 m long and nearly 30 m above the river.
- It has been open to the public since 20 June 2026; access is free, on foot, with no ticket or booking.
- The designated car park is free, on Route d’Herbeumont, about a 20-minute walk from the bridge.
- It closes in bad weather, on hunting days and during works: check before you set off.
Where this information comes fromSources
Every fact carries a label. Nothing is made up: anything without a reliable source is not shown. Most sources are in French.
- Verified matching official source
- Checked on site· 11.10.2026 checked on site
- Press dated press article
- To be confirmed unofficial or older source
Last checked:
- S1Florenville, passerelle himalayenne (page projet)IDELUX · official source
- S2Florenville inaugure sa passerelle himalayenneIDELUX · 20 June 2026 · official source
- S4La passerelle himalayenne à Sainte-CécileSyndicat d'initiative de Florenville · official source
- S7Passerelle himalayenne de Sainte-Cécile (fiche officielle)Parc national de la Vallée de la Semois · official source
- S14Mobilité – TECVille de Florenville · official source
- S16Arrêté de police : interdiction d’accès à la passerelle et au parking, saison de chasse 2026-2027Ville de Florenville · 28 September 2026 · official source
- S17Fermeture ponctuelle de la passerelle et du parking le 14 octobre 2026Ville de Florenville · official source
- S18ChasseOnWeb : les chasses en forêt wallonneService public de Wallonie · official source
- S19La passerelle himalayenne qui relie Sainte-Cécile au domaine des Épioux est inauguréeRTBF · 20 June 2026 · unofficial source
- S21Florenville : les finitions sont en cours sur la passerelle himalayenneTV Lux · 24 April 2026 · unofficial source
- S22Avis à la populationVille de Florenville · official source

